Tuesday, February 24, 2026

Off to Sandblast & Powder Coat…

Brought the chassis (and parts) to Santa Clara Powder Coating

Disassembled the rear leaf spring…

Cleaned up the leafs and ground off the surface rust

Removed the old cups from the bottom leaf

Chassis & parts loaded.


Parts headed to sand-blast w/the chassis

Jaime got the chassis unloaded. Should be done in 7-10 days, and we’ll start re-assembling everything!

L75 300hp Engine…

  It’s time to get the motor to the engine builder… The Distributor will either need rebuilt or replaced. The Fuel Pump will also need rebui...