Tuesday, February 24, 2026

Off to Sandblast & Powder Coat…

Brought the chassis (and parts) to Santa Clara Powder Coating

Disassembled the rear leaf spring…

Cleaned up the leafs and ground off the surface rust

Removed the old cups from the bottom leaf

Chassis & parts loaded.


Parts headed to sand-blast w/the chassis

Jaime got the chassis unloaded. Should be done in 7-10 days, and we’ll start re-assembling everything!

Friday, February 13, 2026

Wednesday, February 11, 2026

More chassis & parts prep for sand blasting…

 

The sanding continues…

Found some rodent nesting inside the frame…


And the vacuum sucked in a ‘petrified’ mouse from inside the chassis!


One of two VIN stampings on the chassis/frame

Covered the VIN stamping with tape, so as not to get ‘filled in’ by the upcoming powder coat process

Sunday, February 8, 2026

Lots & lot & lots of degreasing & sanding…

 

Sandblasting shop requires us to knock down all the grease/grime and surface rust


Original stamping on rear differential cross-member

Correct part number


Lots of rust





The front of the chassis had been ‘painted over’ the rust. Likely with POR-15.

Bagging & tagging…


Rear suspension work…

Mounting the rear strut bracket to the Differential Cushions in place on front Diff. tongue bracket Trailing arm bumpers installed Power ste...